09-01-07 Forcing of document to be considered as completed runs

A non completed document could be forced to be considered as completed by right click in the run info sheet. This features is useful if a multirun has been running for long but has not reaching the final end. After forcing the document to be completed all data from successful runs may be seen as part of the validation results (mbin and xbin files are read).

A recent bug making the simulation run number not to be  correctly updated when exceeding 99999 runs was deleted. All Sim file should be with a run number lesser than 100 000.

The default multi run method for changing parameter values has been changed from Bayesian calibration to Stochastic linear.